Skip to Content
Streetsblog New York City home
Streetsblog New York City home
Log In
Federal Transit Administration

FTA: American Transit Systems Need $77.7 Billion in Repairs

TransitRepairCosts.pngTransit systems need billions of dollars to reach a state of good repair. Image: FTA

Americans who ride trains and buses are suffering the effects of a huge maintenance backlog, according to a new study by the Federal Transit Administration [PDF]. It would take a down payment of $77.7 billion to bring the nation's transit systems up to a state of good repair and another $14.4 billion per year, on average, to keep transit running smoothly, safely, and comfortably for riders. 

The National State of Good Repair Assessment Study is a follow-up to a similar report issued last year, which catalogued the needs of the country's seven largest rail systems. This year's look widens the lens to include small and medium sized transit operators, including rural systems, and buses as well as trains. 

America's bus system is in particularly bad condition, according to the FTA. Nine percent of all assets received the lowest rating, poor, and another 32 percent were deemed marginal. While rail is in a slightly better condition -- nine percent of assets are poor, but only 17 percent are marginal -- the costs of bringing rail to a state of good repair are far higher. It'll take $59.2 billion, plus an average of $8.2 billion annually, to keep the rail system well maintained. 

Last April, the Federal Transit Administration announced a competitive grant program to try and improve the quality of the nation's bus fleet. But though applications for the grants have totaled over $4.2 billion, the agency only has $775 million to disburse.

To put these numbers in context, the federal stimulus law provided $8.4 billion in transit aid.

Even the stimulus act's highway spending only contributed around $16 billion to road repairs (and another $9 billion for expanding road capacity). In other words, America's transit systems need an investment far bigger than the stimulus provided to highway repair, and fast. 

Until that happens, transit riders are going to be less comfortable, less safe, and less likely to keep riding transit. Here's Kaid Benfield of the Natural Resources Defense Council, giving the issue a human face this morning: 

I find myself using DC’s Metro less and less these days, in no small part because it just doesn’t work as consistently well as I need it to in order to meet my needs.  Although our Metrorail system has never been perfect, it has always been a marvel of architectural beauty and engineering achievement, and once was the envy of the nation for its cleanliness, comfort and efficiency. 

Sadly, that is no longer the case.  Today, access to the system is made difficult by broken escalators and elevators all over the system; service can be slow and unpredictable; cars are dirty and crowded; air conditioning systems sometimes provide mediocre cooling in DC's sweltering summer heat.

I used to take Metro all the time for commuting and frequently for other trips as well.  But, while I still use the system several times per week, frequently to shuttle around downtown for meetings, more often than not I now drive to work, shelling out $20 for parking each day and putting up with traffic hassles when I do.

Stay in touch

Sign up for our free newsletter

More from Streetsblog New York City

SCOUT’s Honor: Hochul To Expand MTA Program Pairing Nurses and Cops to Combat Mental Illness in Subways

Gov. Hochul's pitch to state lawmakers follows a nine month-long investigation by Streetsblog into how New York's social safety net struggles to help ill people in the subway.

January 13, 2026

Advance Look: Hochul Offers Major Transportation Policies in 2026 ‘State Of The State’ Speech

Why wait for the governor to start her annual address? We have the goods for you now.

January 13, 2026

State of the State Exclusive: Hochul Will Push ‘Stop Super Speeders’ Bill Through Her Budget

City motorists with a documented pattern of excessive speeding would be required to install speed-limiting devices inside their cars, Gov. Hochul is expected to announce today.

January 13, 2026

Westward Ho! Hochul Proposes to Extend Second Ave. Subway Along 125th Street to Broadway

The westward crosstown extension will connect what is now the Q train to seven different subway lines.

January 13, 2026

Delivery Apps Have Caused $550M In Pay Loss for Workers By Changing How Customers Tip: Mamdani Admin. Report

The average tip on UberEats and DoorDash is just 76¢ per delivery — compared to $2.17 on apps that offer the option to tip before checkout.

January 13, 2026

NJ Pols Want Registration Of Low-Speed E-Bikes, Despite Driver Mayhem

A restrictive e-bike registration bill is one step closer to becoming law in the Garden State.

January 13, 2026
See all posts