Skip to Content
Streetsblog New York City home
Streetsblog New York City home
Log In
Streetsblog

A Better Way to Track How Well Transit Performs

asdf
"Excess wait time" -- or how long riders have to wait beyond the scheduled time between buses -- captures the inconvenience of unreliable transit better than on-time performance metrics that many agencies prefer to use. Graphic: NYC Bus Data API
false

When you're riding the bus or the train, an unexpected delay is the last thing you need. If transit agencies want to know how well they're doing and how they can improve service, they have to track how reliable their service is for riders.

But not all reliability metrics are created equal, writes TransitCenter. Some agencies track their performance in a way that's much less rider-friendly than others:

At the moment, the [New York] MTA and many other agencies tend to use indicators of success that reflect the concerns of the people who actually run subway or other systems. These include on-time performance and the average distance a train car travels between mechanical problems.

But those measurements might not actually indicate whether the agency is delivering good service to riders. For example, regarding subway delay, the MTA relies heavily on a performance metric known as “wait assessment,” defined as the percentage of train arrivals that cause passengers to wait at least 25 percent longer than expected.

Wait assessment has two major problems. First, it is not obvious what it means to have a “good” wait assessment score. If the A train has a wait assessment score of 85 percent, what does that mean for riders? Second, wait assessment is indifferent to how late a train is or how many riders are affected by its lateness. On a line with service every four minutes, a gap of six minutes between trains in the Bronx at 6 A.M. is equally as “bad” as a gap of 15 minutes between trains passing through Grand Central at rush hour.

TransitCenter says Boston's MBTA has adopted a metric more in line with international best practice, one that captures what matters to riders:

There is already a performance metric that does a much better job than wait assessment. It’s called excess wait time, or EWT for short.

EWT measures how much extra time passengers wait for a train or bus compared with the ideal scenario of every vehicle running at scheduled frequencies. This gives it major advantages over wait assessment.

For starters, EWT records delay in minutes rather than as a percentage, which captures the problem of delay for riders much more accurately and intuitively. As a result, long gaps in service that cause big rider delays are weighted more heavily than small delays. Additionally, EWT weights delay by the number of people affected, so a service problem during rush hour counts as a bigger negative than an equivalent service delay on Sunday morning.

Not only has Boston moved toward a more rider-centric metric, it's working on publishing the data in an open format. TransitCenter has supported the development of a data tool to assess the reliability of New York City's bus routes based on the EWT standard. The more agencies that collect this data, release it an open format, and use it to improve service, the better.

Elsewhere on the Network today: Greater Greater Washington reports the extension of the D.C. Streetcar may have dedicated lanes -- addressing a key shortcoming of the existing project. Bike Portland notes that drive-alone rates are falling in greater Portland, even in suburban areas. And The Political Environment considers whether Great Lakes states outside of Wisconsin will use their authority to stop a plan divert Lake Michigan water to a sprawling Milwaukee suburb.

Stay in touch

Sign up for our free newsletter

More from Streetsblog New York City

Here’s A Bus Rapid Transit Plan For New York … If the City Cares

It sure beats the current method of guessing or simply basing the route on how strongly a given neighborhood opposes or supports it.

August 1, 2025

Friday’s Headlines: Water Here, Water There Edition

Blame Father Time, not Mother Nature for Thursday's subway meltdown. Plus more news.

August 1, 2025

Komanoff: Data Show Time Loss from 15 MPH E-Bike Speed Cap is No Big Deal

A 15-mile-per-hour speed limit for motorized two-wheel devices — which e-bikes are — is eminently reasonable. And it doesn't cost much time at all, our columnist found.

August 1, 2025

Cities Matter More Than Ever After Trump Officially Denies Climate Change

We're entering a new era of federal climate denial, and it's time to use a different set of tools (like congestion pricing) to fight back.

July 31, 2025

SEE IT! Small Japanese Pickup Truck Shows Bigger is Definitely Not Better

One Brooklyn business has seen the future of safe streets and heavy lugging — and it's going to be O-KEI!

July 31, 2025

Opinion: Jessica Tisch Must Get Creative About Traffic Enforcement

NYPD speed enforcement needs a revamp — fortunately the city’s own data point the way.

July 31, 2025
See all posts