Skip to Content
Streetsblog New York City home
Streetsblog New York City home
Log In
Streetsblog

America’s “New” Rail Systems Are Showing Their Age

Rail systems like BART and WMATA -- that were built in the 70s and 80s -- are beginning to show their age. Chart via <a href=
Rail systems built 40 years ago like BART and DC Metro have serious maintenance needs. Click to enlarge. Chart via Christof Spieler/Twitter

What should we make of the recent headline-grabbing service disruptions at Washington Metro and BART? This chart from Houston transit advocate Christof Spieler offers some important perspective.

These transit systems are reaching the age where maintenance needs are increasingly urgent. Alex Block at City Block writes:

BART, the snake digesting the mouse: Until seeing the data presented this way, I never appreciated how much of the BART system (navy blue on the chart) was built in quick succession in the early 1970s. The system didn’t add any route miles until the first phases of the San Mateo-SFO Airport extension came online starting in 1995. Contrast that to the history of WMATA (gray bars on the chart) regularly opening smaller system segments over a span of 20 years. MARTA also expanded by adding segments over the course of two decades.

The implication for maintenance is that BART is kinda like a snake digesting a meal -- the bulge of maintenance needs/life cycle costs now coming due. WMATA has a similar length of track to maintain, but won’t have to deal with such a large portion of the system reaching mid-life at the same time.

Block points out that the chart also highlights the shrinking federal support for grade-separated urban rail systems:

End of Federal (Capital) Role: It’s hard to overlook the long-term trend as well -- cities aren’t opening new third-rail, fully grade-separated transit systems anymore. There are only seven of these systems, most of which received substantial capital funding from the predecessor to the Federal Transit Administration, the Urban Mass Transit Administration; and there have only been a handful of expansions of these systems (absent federal funding) since 2004. Of those recent expansions, two are airport connectors (Miami and Oakland – and the other is WMATA’s first phase of the Silver Line, eventually destined to reach Dulles International Airport).

Limited federal funding, rising costs, and limited flexibility of fully grade-separated systems meant that capital spending shifted away from subways and towards light rail systems.  Even high capacity transit projects (such as Seattle’s light rail system) with substantial grade separation have opted for the flexibility of a light rail platform. Subway system expansion in the US is limited to regions locked into that technology.

Elsewhere on the Network today: Transport Providence makes the case for replacing the 6/10 Connector with a surface boulevard instead of an underground highway. Tim Kovach says a parking tax could be a smart answer to Cleveland's transit funding crisis. And Mobilizing the Region points out a glaring flaw in how the Federal Highway Administration markets its National Household Travel Survey.

Stay in touch

Sign up for our free newsletter

More from Streetsblog New York City

Here’s A Bus Rapid Transit Plan For New York … If the City Cares

It sure beats the current method of guessing or simply basing the route on how strongly a given neighborhood opposes or supports it.

August 1, 2025

Friday’s Headlines: Water Here, Water There Edition

Blame Father Time, not Mother Nature for Thursday's subway meltdown. Plus more news.

August 1, 2025

Komanoff: Data Show Time Loss from 15 MPH E-Bike Speed Cap is No Big Deal

A 15-mile-per-hour speed limit for motorized two-wheel devices — which e-bikes are — is eminently reasonable. And it doesn't cost much time at all, our columnist found.

August 1, 2025

Cities Matter More Than Ever After Trump Officially Denies Climate Change

We're entering a new era of federal climate denial, and it's time to use a different set of tools (like congestion pricing) to fight back.

July 31, 2025

SEE IT! Small Japanese Pickup Truck Shows Bigger is Definitely Not Better

One Brooklyn business has seen the future of safe streets and heavy lugging — and it's going to be O-KEI!

July 31, 2025

Opinion: Jessica Tisch Must Get Creative About Traffic Enforcement

NYPD speed enforcement needs a revamp — fortunately the city’s own data point the way.

July 31, 2025
See all posts